Services

Epoxy Flooring Services in El Paso — Epoxy Flooring done right.

Garages, patios, and small commercial spaces—most installs in 1–3 days, backed by a 15-year warranty and clear, neighbor-to-neighbor communication.

15+ yrs
Warranty
1–3 Day
Install Options
Financing
As low as $50/mo*
Insured
Licensed Partners

Choose Your Space

Garages, patios, and small commercial spaces—most installs in 1–3 days.

Garage epoxy floor, high-build flake system
Garage Floors

Durable, clean, hot-tire resistant

  • 1–3 day installs
  • Non-slip options available
  • Resists hot-tire pickup & chemicals
Outdoor patio epoxy/quartz system
Patios / Walkways

UV-stable, textured, easy to clean

  • Quartz & flake systems
  • Non-slip aggregates available
  • Weather & stain resistant
Small business / shop epoxy floor
Shops & Small Business

Tough, low-maintenance, pro look

  • High traffic & spill resistant
  • Quartz & metallic options
  • After-hours scheduling available

Finishes

Three systems, three looks. All prep includes grind + repairs. Most installs wrap in 1–3 days.

Open Full Color Catalog
System

Quartz

Mineral quartz sand broadcast for a tough, UV-stable, textured surface—great outdoors. Choose **Single** or **Double Broadcast** for added build and grip.

Texture
Medium–High
Best For
Patios / Walkways
Build
Single / Double
Double broadcast = second layer of quartz + resin for higher durability and traction (popular around water).
System

Metallic

High-end, liquid look with custom marbling. Every floor is one-of-one, sealed with a UV-stable topcoat for durability and easy cleaning.

Vibe
Showroom
Best For
Indoors
Slip Options
Additive Available
*Swatch colors are approximate. Lighting & screen settings may affect appearance.

How We Work

Simple 3-Step Process To Transform Your Space Efficiently.

STEP 1

In-Home Estimate

We come to you to measure your space, confirm prep needs, and review finishes. Your price is finalized on site and your date is reserved with a deposit.

STEP 2

On-Site Prep

We diamond-grind, repair cracks and moisture spots, and HEPA-vac the slab. Proper prep is 80% of a flawless floor.

STEP 3

Coat & Topcoat

We lay the base coat, broadcast flakes or metallics, then seal with a UV-stable topcoat. Ready for light foot traffic in ~24 hours.

Why Choose Us

Built-right standards on every job. Clean sites, proper prep, and honest pricing.

Diamond-grind + HEPA dust control

Industrial grinders with dust shrouds and HEPA vacuums keep your home clean while we profile the slab correctly.

Moisture & crack repair before coating

We test for moisture, route and fill cracks, and patch spalls so the coating bonds and stays put.

Non-slip additives available

Choose fine or aggressive grit blended into the topcoat for wet areas, ramps, and safety zones.

Transparent pricing & financing

Clear scopes and written quotes. Simple monthly options available with approved credit.

Before / After

See real transformations across garages, patios, quartz, and metallic systems.

After — Garage flake system Before — Raw concrete
Garage
Flake
After — Quartz system Before — Cracked slab
Garage
Quartz
After — Outdoor quartz Before — Weathered patio
Patio
Quartz
After — Patio flake Before — Stained concrete
Patio
Flake
After — Metallic showroom look Before — Plain slab
Metallic
After — Quartz around pool Before — Slippery surface
Quartz
Patio